Introduction

About Us

Over time the technical staff at  ENSO Global Energy Solutions has developed its products through various company structures, developing an extensive database and substantial knowledge, as well as ample industry experience.

ENSO Energy Environment & Sustainability is the new Company of the strategic partnership between Tikehau Capital and Total in T2 Energy Transition Fund , which receives the assets, subsidiaries and team of the Gestamp Biomass Group.

ENSO Global Energy Solutions are a division of this new company, dedicated to the development, promotion, construction and operation of biomass power generation facilities.

Currently,  ENSO Global Energy Solutions is organized according to the following diagram. Its engineers and technicians are fully qualified to perform work in various areas: plotting and design, project management, manufacturing, commissioning, etc.

+ 50.000

Employees

+ 160 Plants

Around the globe

+ 12 billions US Dollars

Turnover

Timeline

Prior to 2000
1998: “Thermal power station for extractive industry – Hermanos de Santa María Muñoz e Hijos, S.L.”


Between 2000 and 2002
2002: “Thermal power station for Fuente de Piedra olive industry” – Becosa (Spain)
2000: “Thermal power station for oil extraction industry” – Cooperativa El Tejar (Spain)


Between 2002 and 2008
2004: “Fuel oil to biomass/solid fuel change study for drying line. Thermal study” – Briqueterie Bati Chaouia (Morocco)
2008: “Heavy fuel-oil boiler revamping” – Nicaro (Cuba)
2007: “Linares bioelectrical company” – Iberese (Spain)
2006: “Desulfurization plant: Flue gases, ducts and supports structures engineering and drawings” – Initec (Spain)
2005: “Basic engineering, thermal design and technical specification for an HRSG turbine” – Morisa (Spain)
2005: “Puente Genil Biomass Thermal Power Station”– Iberese (Spain)


Between 2008 and 2012
2010: “20 MWth Oxy-combustion pulverized coal boiler”


Between 2012 and 2016
2012: “15 MWe Biomass Boiler in Garray” – Gestamp O&M (Spain)
2016: “15 MWe Biomass Boiler in Fundão” – Gestamp O&M (Portugal)
2016: “15 MWe Biomass Boiler in Viseu” – Gestamp O&M (Portugal)
2016: “15 MWe Biomass Boiler in Torredonjimeno” – Gestamp O&M (Spain)
2016: “15 MWe Biomass Boiler in Piedrabuena” – Gestamp O&M (Spain)


Between 2016 and 2018
2016: “Nestlé Heat Recovery Steam Generator (HRSG) revamp”; Design, manufacture and advisory services for the commissioning of an HRSG at the Nestlé plant in Gerona. Customer: Babcock Montajes.
2016: “Biomass Boiler in Viseu”; Supply to Elecnor of comprehensive combustion island for biomass thermal power station in Viseu (Portugal)
2016: “Biomass Boiler in Fundão”; Supply to Elecnor of comprehensive combustion island for biomass thermal power station in Viseu (Portugal)
2016: “Modification Duct in Berlin”, Modification of duct in biomass boiler in Berlin (US), as a result of the CFD studies previously conducted by GES.
2017: “Ence Biomass Boiler in Huelva”; Turnkey supply of combustion island for new Ence biomass plant in Huelva (Spain)
2017: “Ence Biomass Boiler in Puertollano”; Turnkey supply of combustion island for new biomass plant at Ence’s facilities in Puertollano (Spain)
2018: “HU41 Revamping “; Revamp of HU41 boiler at Ence’s facilities in Huelva (Spain)
2018: “Risers in Puente Genil”; as a result of studies on natural circulation in Sacyr boiler, riser replacement and improvement work is being performed to troubleshoot natural circulation issues.

Company Organization Chart

Quality, Environment and Occupational Health & Safety

ENSO Global Energy Solutions has an Integral Management System in accordance with international standards UNE-EN ISO 9001:2015 and UNE-EN ISO 14001:2015 and OHSAS 18001:2007, respectively.